What is Online Data Recovery Report? It’s all about browsing your rescued files!

Here is an example of online report. Just imagine that this might be your real data and you need to explore the recovery results by browsing through the trees of rescued files and folders.
Click on any folder (BLUE) and see how it works!
• Explore the recovery report the same way you do it on your computer in the file manager.

» Root » Desktop »
« Click on item to expand or collapse a folder and all its subfolders
Names
Size
Type Date
100427 Folder 
Adam T. 11-10-11 Folder 
STRUCTURAL-CONTROL VAN Folder 
XOM TIME LINES Folder 
  01 SF30_Iraq TOCs_ A04.doc57,344doc23.02.2012
  1 CareerBuilder Job Application JD-030 CAD Operator.msg55,296msg07.05.2012
  100107-90902-WALL SECTION.pdf25,735pdf29.09.2010
  100110 Flowserve - PSR 4-4-11.xls74,240xls10.08.2011
  110038 Worley Project Status Report 7-8-11.xls71,168xls08.07.2011
  110212 - Structural Steel PO 0038485.pdf473,023pdf10.04.2012
  11R - 110098 - Metalizing Equipment and Wire.xls81,408xls25.10.2011
  12x18 test stand module.jpg154,242jpg18.07.2011
  2011 OBO SPEC - Division 15.pdf2,339,930pdf18.07.2011
  4041_Series_Instruction_Sheet_Push_28103r9.pdf240,858pdf12.10.2011
  45404 Structural Drawings.pdf722,311pdf20.09.2010
  6-110180-Dean Steel Exterior Door.xls76,288xls06.02.2012
  80183 W80183 Field Service Expense Budget (Install HVAC).msg48,640msg18.07.2011
  90144 Architectural Drawings.pdf2,387,747pdf09.04.2010
  90144 Structural Drawings.pdf3,023,143pdf09.04.2010
  90232 Antenna Platform Drawings.pdf1,484,879pdf18.11.2010
  90232 Generator Module Tape.xls82,944xls14.10.2010
  90232 Generator Screws.xls82,944xls14.10.2010
  90232 Missing Platform Bolting.xls89,088xls21.09.2010
  90232 Platform Fasteners 2.xls82,944xls11.10.2010
  90232 Roof Bolting.xls89,088xls21.09.2010
  90232-M-101.pdf198,235pdf29.10.2010
  90286 - BP North America - PSR 4-11-11.xls71,680xls01.07.2011
  A-101 (1).pdf107,358pdf28.06.2012
  AIS Spec.pdf1,801,107pdf29.03.2010
  Backlog Report End of May forecast Trac.xls229,376xls16.05.2011
  Bradford White Model 20A-3-3-100B-AA.pdf327,390pdf24.09.2010
  Bright Galvanized Spray Compound.pdf82,543pdf04.10.2010
  Burndy.pdf101,793pdf01.02.2012
  C-S-F-M Meeting Minutes 19 Dec 2011.pdf217,340pdf19.12.2011
  CAD OPERATOR.docx10,831docx16.11.2011
  CAD PRIORITY SCH 8.15.11.xls28,672xls07.09.2011
  Cad Priority Schedule.xls30,208xls20.09.2011
  Calendar.url64url06.05.2012
  Carboline Products with MBI Part Numbers, 1-6-12.xlsx10,400xlsx06.01.2012
  CareerBuilder Job Application JD-030 CAD Operator.msg76,800msg07.05.2012
  ccsetup300_slim.exe1,943,584exe16.11.2010
  compliance-report-20101004_153306_574.pdf38,303pdf04.10.2010
  Conference Call Number.pdf1,025,158pdf16.02.2012
  Copy of CAD PRIORITY SCH.xls25,600xls08.08.2011
  Copy of Engineering Schedule.xls241,152xls29.09.2010
  Copy of Master New Part Numbers.xlsx225,875xlsx15.05.2012
  Copy of MBI Material Needs May 24 2011 (Keith).xlsx62,803xlsx10.06.2011
  CVX_90311_Quote.docx14,153docx24.02.2012
  Door Schedule 2011-08-23.xlsx18,889xlsx26.08.2011
  Door Window Drawings & Calculations for 90262.pdf739,131pdf27.09.2010
  E-Mail, MMI Engineering Design, Structural, 12-9-09.pdf87,630pdf30.12.2010
  E741 Air Change Survey Report 2010.pdf1,428,623pdf05.04.2011
  Electrical Part Number by Division.xlsx10,425xlsx03.08.2011
  Employee's Directory.xls61,440xls01.06.2011
  Engineering Drawings.xlsx11,417xlsx24.04.2012
  Engineering Hours AL.xls23,552xls03.08.2011
  Engineering Hours.xls483,840xls28.09.2010
  Engineering Schedule.xls481,792xls25.06.2012
  Excerpt from ASCE.pdf152,349pdf14.02.2012
  Exterior Dimensions of seems.pdf139,402pdf29.10.2010
  EXXON - Remaining Job Costs 2.xls61,952xls06.04.2011
  Factory Permits.pdf709,599pdf22.06.2011
  FedEx Shipment 793067541982 Delivered (13.7 KB).msg35,328msg24.01.2012
  FW .msg58,368msg18.10.2011
  FW Back-charges for MB Industries.msg584,704msg04.05.2011
  FW Crude Operations Shelter Pressurization Modifications.msg54,784msg26.01.2011
  FW Mod to Roof Design for Comm Antennas.msg1,289,728msg17.01.2011
  FW Panel System Quote 90232.msg465,408msg13.06.2011
  FW Press Release - MBI Retooling its Shreveport Plant.msg69,632msg19.10.2011
  Generator Exhaust.pdf100,799pdf24.09.2010
  HVAC Building.pdf94,681pdf07.09.2011
  HVAC Quote, Specific Systems, Rev.1.xls48,640xls09.10.2009
  Interim Office Building Diggs ReportFPE.doc44,544doc19.01.2011
  INVOICE P11148-151.msg25,600msg18.07.2011
  Invoice.msg20,992msg18.07.2011
  J-Gate Guard Plan View.pdf15,130pdf02.06.2011
  JG-12-299 MB INDUSTRIES 110065 QUOTE reviewed.pdf77,553pdf13.06.2012
  Job #90286 Drawing Transmittal.xls119,808xls01.07.2011
  LEET Transmittal to OBO.pdf44,262pdf24.01.2012
  Lista SO# 492050 MBI PO #0034531.msg31,232msg07.02.2011
  MB Industrial PO 4550749730.pdf63,795pdf12.01.2011
  MBI Misc Added Costs Oct 2011.doc38,400doc07.10.2011
  MBI Final Approval Sep01_10.zip1,460,846zip08.09.2010
  MBI Marathon Final Invoice 13July11.pdf56,929pdf14.07.2011
  MBI Proposal 3-14-2011.doc71,680doc28.04.2011
  MBI Sharepoint Server.url103url22.03.2011
  MBI Site Visitor Form.doc318,464doc30.01.2012
  MBI TOC generator resubmittal comments 101411.pdf67,005pdf25.10.2011
  MBInd.pdf87,725pdf01.05.2012
  MBIstackltr.pdf9,974pdf09.07.2012
  MCS-2017 - SURELOCK THRESHOLD DETAILS.bak211,153bak21.06.2012
  MCS-2017 - SURELOCK THRESHOLD DETAILS.dwg164,388dwg21.06.2012
  MEC10-004-revF.doc1,827,328doc28.10.2010
  MES-100110-1 with FLS comments.pdf636,522pdf18.02.2011
  MES-1015 DRAWINGS.pdf - Adobe Acrobat Pro.pdf553,912pdf17.10.2010
  MES-2001-1 - 10-200 with Window.bak344,806bak01.10.2010
  MES-2001-1 - 10-200 with Window.dwg344,773dwg01.10.2010
  NAMASCO 516GR70 UT REPORT.pdf - Adobe Acrobat Pro.pdf112,392pdf12.01.2011
  NNNCash Flow Projection.xlsx48,057xlsx08.11.2011
  O.dwg74,142dwg28.01.2011
  OBO 90% Comment Responses.xlsx14,141xlsx16.02.2012
  OrderAcknowledgement-2901[1].pdf64,052pdf29.09.2010
  Original WV-S Compiled 10-4-05.pdf855,022pdf14.06.2012
  P&ID.pdf915,834pdf23.12.2010
  P4563 Thermal Analysis of Operator Shelter.pdf1,284,404pdf19.10.2010
  PEI - Copy.pdf161,435pdf17.11.2010
  plot.log1,275log01.10.2010
  Plumes.txt22txt22.07.2011
  Pricing Options, 1.18.10.pdf24,680pdf13.06.2011
  Priority Schedule.xlsx11,606xlsx20.03.2012
  Production Milestones Draft.xlsx52,362xlsx24.02.2012
  Production Update March 2010 (2).xlsx160,504xlsx25.05.2011
  Progress Billings - 12 21 11.msg667,136msg21.12.2011
  Project Issues (3).xlsx12,359xlsx18.01.2011
  Project Issues.xlsx12,688xlsx26.01.2011
  Project Warranties and Deficiencies.xls60,928xls07.09.2011
  Projected Engineering Schedule.xlsx12,993xlsx16.02.2011
  QD 7.4-13 New Vendor Data Sheet.doc91,648doc15.04.2011
  QD 7.5-01 Plant Traveler.doc236,032doc15.04.2011
  QD 7.5-13 Ship Loose Manifest 100185 MBU#5.doc162,304doc13.01.2011
  QD 7.5-14 Module Maintenance.doc79,360doc11.03.2010
  QD 8.1-04 Final Inspection Rev.7.doc905,728doc17.02.2011
  Quotation Chevron Dollarhide P090311.msg54,272msg20.01.2011
  RE BP Blast Resistant Buildings.msg37,376msg13.07.2011
  RE Files needed.msg53,248msg18.10.2011
  RE MBI Proposal P100243.msg346,112msg12.10.2010
  RE MBI Shreveport.msg34,304msg05.10.2011
  Re PBF Energy - Toledo Refinery Job.msg41,472msg21.12.2011
  RE PO REPSOL blast module (Door Question).msg55,808msg25.05.2012
  RE Stop Work Order 110039.msg104,960msg29.02.2012
  RLB Submittal Schedule rev 1_gmb 2-17-2010.xls263,680xls28.06.2011
  Scope of Work for Valero TXCity, 90204.docx14,261docx01.10.2010
  Site Visitor.pdf227,258pdf22.11.2011
  Spray Foam Bill of Lading.pdf43,374pdf02.02.2012
  Suncor.100092.Flooring.QD 7 2-02 Open Job Request.doc124,928doc20.01.2012
  Test Building DWG's.pdf8,342,968pdf01.08.2011
  Testing Specification.msg159,744msg19.01.2011
  TOC Manpower Loading.xlsm64,206xlsm25.04.2012
  Toilet American Standard Yorkville 2325.pdf174,551pdf20.01.2011
  Tubular Steel Quote.pdf47,632pdf27.01.2012